- Centurion
- 07/08/2025
WESTWATER DELIVERS CRITICAL WATER TREATMENT SYSTEM UPGRADES AT MAJOR POWER STATION

Centurion is pleased to announce that WestWater, part of our Asia Pacific region, has been awarded a new contract by Worley Power Services to deliver critical water treatment system upgrades at the Collie Power Station in Western Australia.
WestWater will design, supply, and install two new enclosed chemical dosing pump cabinets, replacing existing infrastructure within the plant’s Mixed Bed and Condensate Polishing systems. The upgraded units will ensure accurate sodium hydroxide dosing, helping to maintain high water quality standards, improve operator safety, and reduce ongoing maintenance.
To support uninterrupted operations during installation, WestWater is also delivering a temporary dosing system that will keep essential processes online. The scope includes full system design and fabrication, safe removal of the existing units, and comprehensive factory and site acceptance testing.
With work now underway and completion expected by mid-2026, this project reinforces WestWater’s reputation for delivering safe, reliable, and efficient water treatment solutions for critical infrastructure.
Back to News